Kioreroa Road rising mains roadworks

Event date: Saturday, 23 November 2024 | 10:00 PM to Friday, 20 December 2024 | 11:59 PM

Two old sewer mains carrying wastewater along Kioreroa Road to our wastewater treatment plant are being replaced.

The road from Port Road roundabout to the wastewater treatment plant will remain open in both directions during the day.

One lane may be closed at night with stop / go traffic control in place when needed.

Driveways and access to businesses will be retained.

There will be no interruption to the wastewater system during this work.

 Map showing the section of pipe that is going to be replaced on Kioreroa Road.

When

  • Friday, 07 June 2024 | 12:00 AM - Friday, 20 December 2024 | 11:59 PM

Location

Port Whangarei to 82 Kioreroa Road, Whangārei, 0110, View Map

Google Map
Tagged as: