MetService has issued a weather warning for Whangārei District to last until 2:00pm today, Tuesday 21 January 2025. Check here for storm road closure information.
Design is underway for the John Street upgrade.
The upgrade to John Street is proposed to be a high-amenity, one-way slow-street, connecting the city centre to the waterfront.
The areas selected for the upgrade are:
The upgrade of John Street will also include improvements to how stormwater is managed in an already low-lying area. Raingarden-type solutions can help rainwater pass through filtering systems before being discharged into the conventional stormwater network.
The intention is to create clear movement with planting, outdoor dining and activity zones from Dent Street at the waterfront to Cameron Street in the city centre.
Design will be carried out over the next 12 months, with construction not scheduled until years 4 to 7 of the Long Term Plan (2027-2031).
John Street, Whangārei 0110 View Map
John Street , Whangārei 0110
Northern suburbs asked to save water
Sign up now