High Street footpath improvements The project features new footpaths, upgraded drainage, improved pram crossings, and three new recessed bus bays, making the area safer and more accessible for pedestrians. Project type: Safety improvements - new footpath
Kamo Shared Path in Te Kamo - Stage 5 Stage 5 of the Kamo Shared Path in Te Kamo connects the path with Te Kamo Village. Project type: Infrastructure
Lovers Lane boardwalk and path The path and boardwalk connecting the newly constructed Lovers Lane Bridge to the Raumanga Shared Path at Second Ave are now completed. Project type: New boardwalk and path
Lovers Lane bridge replacement We built a new bridge to replace the old Lovers Lane bridge between Cafler Park and Second Avenue. Project type: Improvement work
New composting loos for Matapōuri New waterless, composting toilets are now open at Matapōuri beach. There are two unisex single cubicles and one disabled cubicle. Project type: Infrastructure improvement
New footpath from Lake Drive to Corks Road (Tikipunga) We built a 300 metre footpath from Lake Drive to Corks Road in Tikipunga. Project type: Improvement work
Onerahi Sports Field improvements The main football pitch at Onerahi received a complete overhaul with new irrigation, drainage and a sand-carpet surface. Project type: Improvement
Port Road - Kioreroa Road improvements: Stage Two We built a new roundabout and replaced the railway crossing to improve traffic flows. There were lane closures and road closures during the work. Project type: Transport and roading
Raised platforms in Waipū Cove We carried out a project to improve pedestrian safety and reduce vehicle speeds in Waipū Cove following requests from the community. Project type: Safety improvements
Raumanga Scenic Reserve playground We've completed building a new playground at Raumanga Scenic Reserve featuring slides, climbing frames, balance challenges and an accessible seesaw. Project type: Playground
Raurimu Avenue road safety improvements The school crossing has been upgraded to a raised platform, with speed bumps installed on either side to ensure that cars travel at safe speeds for children and pedestrians. Project type: Safety improvements
Roof replacement of Old Library We replaced the leaking roof of Old Library between July and December 2023. Project type: Improvement work
Tamaterau Reserve car park construction Work is complete on the construction of new car park and concrete driveway near Tamaterau Hall. Project type: Infrastructure improvement
Town Basin facilities upgrade A major re-vamp including safer bus stops, mobility-friendly parking and carparks, new public toilets, better footpaths, landscaping and wayfinding signs. Project type: Infrastructure improvements
Tropicana seawall project We have built a replacement seawall along Tropicana Drive, Tamaterau that fits with existing topography. Project type: Replacement seawall
Vine Street safety improvements This upgrade provides a safe connection between the Whangārei CBD and the Rose Street bus terminal with an official pedestrian crossing, featuring new signs, lights, and enhanced drainage. Project type: Safety improvements
Waikaraka Bridge Wastewater Pipe Replacement We replaced the existing wastewater pipe crossing at Waikaraka Bridge along Whangārei Heads Road as it was at risk of failure. Project type: Pipe replacement (emergency works)
Whale Tail Park - Playground renewal We renewed the Whale Tail Park playground in Ngunguru as it was getting old and had drainage issues during winter. Project type: Playground